Road controller for the coordinated traffic lights BDKL-2

Road controller for the coordinated traffic lights BDKL-2

Road controller for the coordinated traffic lights BDKL-2

Road controller for the coordinated traffic lights BDKL-2

Road controller for the coordinated traffic lights BDKL-2

Purpose / Description

The control of traffic lights and other equipment installed at the traffic lights assets ensures the traffic control and safety.

BDKL-2 road controller is manufactured in 16 versions of the electric circuit defining the number of power circuits and availability of МСК-4Н module.

Operating temperature range, С

from -40 to +50

Relative humidity
(without mandatory heating or ventilation), %

Up to 98±2, (35°С)

Power line voltage (frequency 50±1 Hz), V

230±23

Consumed power without loading, W

Up to 50

Number of independently controlled power circuits for connection of traffic light lamps (specified by a design style)

16,32, 48, 64,80,96,112,128

Current of one power circuit


- maximum, А
- minimum controlled power circuit current, mA

2
10

Weight (with a cabinet), kg
(without a cabinet), kg

Up to 83
Up to 29

Overall dimensions (with a cabinet), mm

606x1270x380

Average lifetime (years)

10

Performed functions

  • Galvanic decoupler to control (test) of power circuits from a power line;
  • protection of output power circuits against a short circuit with automatic traffic lights shutdown;
  • monitoring of lamps blowing (breakage);
  • detection of “red” and “green” lights conflict with automatic traffic lights shutdown;
  • monitoring of power circuits locking between each other.

Features & Benefits

  • Quantity of the controlled traffic phases is up to 32;
  • quantity of traffic directions is up to 60;
  • the quantity of serviceable sensors and detectors has been increased up to 64;
  • reading of the controller settings data from an external flash drive;
  • recording of the controller settings data to an external flash drive;
  • saving of a crossroad certificate in PDF format;
  • adjustable switch of programs by taking into account holidays (including religious holidays);
  • centreless coordination including the mode: master-slave;
  • availability of a built-in engineering module;
  • flexible distribution and setup of the increased number of power channels (up to 128);
  • low minimum controlled electric current in each power channel is up to 10mА allowing connection and control of LED charging (up to 3 W);
  • generation of info signals at an alarm pedestrian panel (wait, go and etc.);
  • the possibility to apply as follows as transport detectors: induction, coil (loop), infrared, radar, video and wireless detectors;
  • possibility to synchronize the watch upon GPS signals;
  • possibility to connect and control a road controller by using wire (Start, Ethernet) and wireless channels of the automated traffic control system (GSM).